Planning a PACE and seca facility: what to prepare
From equipment and console compatibility to onboarding and staff operations: questions that support an organized implementation.

PACE connects measurement data, goals and guided exercise on compatible MATRIX equipment. Turning the technology into a clear club service requires planning both the member journey and the staff workflow. This article focuses on project preparation; the detailed site guide covers system components and seca devices.
A connected specification includes machines, consoles, software and an operating workflow, not just a PACE label beside a series name.
Define the member service
Decide what happens on the first visit: who introduces the service, where measurement takes place and how the member proceeds to training. Define follow-up and who explains the information. A clear sequence helps staff set expectations; connectivity alone should not be presented as a guarantee of physical results or adherence.
Confirm compatibility at product level
MATRIX describes guidance through supported cardio Touch consoles and strength Intelligent Training Consoles. A project still needs an exact list of models and configurations for confirmation. Do not infer compatibility from an ONYX finish, series name or image. Confirm activation, software and available features in Israel before ordering.
Plan the measurement position
The seca position affects circulation, comfort and staff conversations. Check model dimensions, access, power and network requirements, along with appropriate privacy for personal information. Measurement should not obstruct the entrance or the route between training stations.
Assign account and infrastructure responsibility
Agree with system providers who creates accounts, manages permissions and handles user questions. Define networking, updates, software and associated costs where applicable. Also prepare an operating procedure for connected-service unavailability, consistent with equipment capabilities and instructions.
| Topic | What to confirm |
|---|---|
| Equipment and consoles | A list of compatible models and configurations |
| Measurement | seca model, position and onboarding process |
| Software | Activation, languages, licensing and updates |
| Staff | Training, permissions and support contact |
Rehearse the sequence before launch
Once the configuration is approved, rehearse the intended user journey in the facility. Record unclear steps, support issues and responsibility across providers. Launch should include a process staff understand and can explain, beyond equipment being powered on.
THE NEXT STEP
Bring this to your next meeting
- A list of requested MATRIX models and consoles.
- Compatibility and service-activation confirmation for each configuration.
- A measurement-station and infrastructure plan.
- An implementation owner, staff training and support process.
Questions to resolve during planning
Can PACE be added to any existing equipment?
Do not assume so. The model, console and supported options need individual assessment. Start with an inventory of existing equipment and request compatibility confirmation.